With the protruding pantry finally gone we were starting to see the light. But, this fifth week would see the most noticeable progress so far!
The first thing on the list was finish the living room and kitchen walls – meaning fill all the holes! Marc had done a great job sheetrocking the master (with help from Chris and Johnny) but, the living room kitchen areas needed some serious work including floating .25″ sheetrock over the entire ceiling and re-taping the kitchen which was too much work for us. So, we hired it out to an excellent crew. But, before they could come out to make things pretty, we had to fill all the holes (around the recessed lights and the attic holes.
The crew was amazing! They quoted us a price and even after caused a few extra holes after the
quote – they fixed them for us for no extra charge. SO WORTH the additional expense that we weren’t expecting.
TA-DA! Smooth, lovely walls:
With the crew working on the walls, Marc and I concentrated on other demo. Marc took out the absolutely hideous light peach
colored backsplash and I took out the baseboards.
It was a productive albeit messy week.
[nggallery id=15]